All timeline stories.
1985
Installed 1.05 megawatt hydroelectric power plant at the
Installed 1.05 megawatt hydroelectric power plant at the
Partnered with other major water agencies in the
Devil Canyon-Azusa Pipeline extended from Azusa to the
District’s water conservation guru H2Owl introduced on Earth
$10 million in grants and loans provided to
Began delivering water from northern California to supplement